PT CCEPC Indonesia serves as the main EPC contractor for the development of two dedicated substations supporting the CGK-01 Data Center in Cikarang GIIC and the CGK-02 Data Center in Karawang KIIC. The projects are designed to provide reliable and stable power infrastructure, supporting the operational continuity and growing energy requirements of critical data center facilities.
CGK-01 Data Center Substation Project
PT CCEPC Indonesia serves as the main EPC contractor for the development of two dedicated substations supporting the CGK-01 Data Center in Cikarang GIIC and the CGK-02 Data Center in Karawang KIIC. The projects are designed to provide reliable and stable power infrastructure, supporting the operational continuity and growing energy requirements of critical data center facilities.
CGK-02 Data Center Substation Project
PT CCEPC Indonesia is responsible for the EPC development of the dedicated substation supporting the CGK-02 Data Center in Karawang KIIC. The project strengthens the data center’s power supply infrastructure, ensuring high reliability, operational continuity, and capacity to support future energy demands.