PT CCEPC Indonesia serves as the main EPC contractor for the development of two dedicated substations supporting the CGK-01 Data Center in Cikarang GIIC and the CGK-02 Data Center in Karawang KIIC. The projects are designed to provide reliable and stable power infrastructure, supporting the operational continuity and growing energy requirements of critical data center facilities.

CGK-01 Data Center Substation Project

PT CCEPC Indonesia serves as the main EPC contractor for the development of two dedicated substations supporting the CGK-01 Data Center in Cikarang GIIC and the CGK-02 Data Center in Karawang KIIC. The projects are designed to provide reliable and stable power infrastructure, supporting the operational continuity and growing energy requirements of critical data center facilities.

CGK-02 Data Center Substation Project

PT CCEPC Indonesia is responsible for the EPC development of the dedicated substation supporting the CGK-02 Data Center in Karawang KIIC. The project strengthens the data center’s power supply infrastructure, ensuring high reliability, operational continuity, and capacity to support future energy demands.

Share This Project

Greenland International Industrial Centre (GIIC)